亚洲欧美日本韩国_久久久久亚洲AV片无码V_亚洲AV片不卡无码一_H漫全彩纯肉无码网站

 
 
當(dāng)前位置: 首頁(yè) » 新聞資訊 » 廠商 » 正文

GMW15919油漆附著力熱沖擊試驗(yàn)標(biāo)準(zhǔn)_91化工儀器網(wǎng)

分享到:
放大字體  縮小字體    發(fā)布日期:2019-09-02  來(lái)源:儀器信息網(wǎng)  作者:Mr liao  瀏覽次數(shù):530
核心提示:1 ScopeThis procedure is used to determine the resistanceto coating adhesion loss of coated surfaces ofaluminum, plastic, steel, and other substrates when subjected to a wet steam blast similar to thatproduced by vehicle wash equipment.Note: Nothing in th






 

 


1 Scope
This procedure is used to determine the resistanceto coating adhesion loss of coated surfaces ofaluminum, plastic, steel, and other substrates when subjected to a wet steam blast similar to thatproduced by vehicle wash equipment.
Note:  Nothing in this standard supersedesapplicable laws and regulations.
Note: In the event of conflict between the English
and domestic language, the English language shall take precedence.
1.1 Purpose. To determine the resistance to coating adhesion loss of coated surfaces of aluminum, plastic, steel, and other substrates when subjected to a wet steam blast similar to that produced by vehicle wash equipment.
1.2 Foreword. Not applicable.
1.3 Applicability. Painted exterior components of vehicle.
2 References
Note: only the latest approved standards are applicable unless otherwise specified.
2.1 External Standards/Specifications.ISO 2808
2.2 GM Standards/Specifications.
3 Resources
3.1 Facilities. Not applicable.
3.2 Equipment.
3.2.1 Test Equipment and Material.
3.2.1.1 Scribe Tool. A straight-shank tungsten carbide tip, lathe cutting tool or carbide-tipped pencil type tool with tip angle of 60 15 degrees or equivalent.
3.2.1.2 Razor blade.
3.2.1.3 Water Bath. Water bath at 38 2 C temperature with 5 ppm maximum dissolved solids as measured utilizing a suitable dissolved solids meter.

3.2.1.4 Freezer capable of maintaining -29 3 C temperature.
3.2.1.5 Steam generator.
Note: Model 100 (and the earlier Model 60) steam generator (from Atomic Steam Co., 10727 Fendell, Detroit MI 48238) has been found to be satisfactory. Milwaukee 1.27 cm ( 1 / 2 in) globe valve 1151 to 1161, 150 Steam Working Pressure,
300 Water-Oil-Gas,  is  adequate  for  use  in standardization of generator.
3.2.1.5.1 Input Flow of Water. 2.7 L/minute with a deviation less than 5% (3.2.1.5.1.1).
3.2.1.5.1.1 Model 100 Steam Generator. The pumping pressure is directly related to the input flow rate. The pressure needed for the required flow can be determined by measuring the pump pressure and discharge flow rate with the burner off. When the burner is turned on, the required flow rate is obtained by readjusting to the required
pump pressure.
3.2.1.5.2 Nozzle Diameter. 12.5 mm ID within 2% and at least 100 mm long.
3.2.1.5.3 Discharge Dynamic Head. 37.9 kPa within 5% measured 25 mm from the nozzle using a 47 mm ID tube. A nondiverging discharge is required for this test (3.2.1.5.3.1 and 3.2.1.5.3.2 and Figure 1).
3.2.1.5.3.1 This is done by placing the tube midstream 25 mm from the nozzle. The tube size must not be varied because the densities and velocities are not uniform throughout the cross section of the discharge stream.
3.2.1.5.3.2 Adjusting the discharge dynamic head may be required. This must be done in such a way that the input flow rate as specified in 3.1.7.1 is maintained. This is done by adjusting the amount of heat transferred to the water. Increasing the heat will cause the input flow rate to change. It must be readjusted. This operation will result in an
increased dynamic pressure. To decrease it, decrease the heat and then adjust the flow (pressure).
3.2.1.6 Face Mask. Full face cover safety mask is required when performing this test.
3.2.1.7 Gloves. Gauntlet-type gloves for protection of hands are required.
3.3 Test Vehicle/Test Piece. Not applicable.
3.4 Test Time. Not applicable.
3.5 Test Required Information. Not applicable.
3.6 Personnel/Skills. Not applicable.
4 Procedure
4.1 Preparation. Not applicable.
4.2 Conditions. Not applicable.
4.2.1 Environmental Conditions. Not applicable.
4.2.2 Test Conditions. Deviations from the requirements of this standard shall have been agreed upon. Such requirements shall be specified on component drawings, test certificates, reports,etc.
4.3 Instructions.
4.3.1 Standardize the Model 100 steam generator.
4.3.1.1 Measure and maintain the input flow at
2.7 L/minute.
4.3.1.1.1 Install a 1.27 cm ( 1 / 2 in) globe valve in the steam line between coil weld assembly and hose nipple, 0.4 cm (5/32 in).
4.3.1.1.2 With burner off, engage pump and adjust globe valve until 2.7 L/minute is obtained.
4.3.1.1.3 Record the tank pressure that is obtained with the 2.7 L/minute flow rate. (This induced back pressure simulates the pressure that steam exerts on the system while the burner is on.)
4.3.1.2 Measure and maintain the mean dynamic head at 37.9 kPa.
4.3.1.2.1 Open globe valve and turn on the burner.
4.3.1.2.2 Allow tank pressure to stabilize before reading the mean dynamic head.
4.3.1.2.3 Adjustments of the dynamic head are to be made by changing the amount of heat transferred to the water at the burner. (The flow rate, as previously specified, must be maintained.)
4.3.2 Measure and record film thickness at proposed test sites per ISO 2808.
4.3.3 Immerse the parts or panels (previously prepared per engineering material specification) in the water immersion tank for 3 h at 38 2 C.Aerate the water by placing a 6.5 ram (0.25 in) ID plastic tube at the bottom of the tank and bubble
air at a rate of 1 bubble per second minimum.Maintain 5 ppm maximum dissolved solids (as NaCl) in the water. Check and record NaCl level using dissolved solids meter.
4.3.4  Remove  the  samples  after  3 h  and immediay place in freezer at -29 3 C.
4.3.5 Prepare a suitable rack to hold the test panels.
4.3.6 Following a 3 h minimum freeze cycle, remove the sample and immediay scribe an X through the coating into the substrate across the entire panel or part where feasible (Figure 2). A razor blade should be used on elastomer substrates. Mount the sample on the test rack.
4.3.7 Within 60 s from freezer removal, direct the steam blast at the scribe lines for a rain of 30 s.Angle of impingement and distance from the panel are important; care must be taken to ensure the dimensions are adhered to as follows: 45 degree
angle at a 50 to 75 mm distance (Figure 3).
4.3.7.1 High pressure wet steam represents a potential safety hazard. Not only is it necessary to secure the samples properly, but full face protection and gloves are required.
4.3.8 Remove from blast, examine, and report any loss of paint adhesion and/or any blushing (i.e., whitening, loss of gloss) and the average distance of paint adhesive loss from the scribe line.

 

 

 

   Figure 1: Measuring the Discharge Dynamic Head






  Figure 2: Scribe on Panel


 

    Figure 3: Steam Blast Impingement
5 Data
5.1 Calculations. Not applicable.
5.2 Interpretation of Results. Examine sample for any loss of paint adhesion and/or any blushing (i.e., whitening, loss of gloss) and the average distance of paint adhesive loss from the scribe line.
5.3 Test documentation. Report any loss of paint adhesion and/or any blushing (i.e., whitening, loss of gloss) and the average distance of paint
adhesive loss from the scribe line.
6 Safety
This standard may involve hazardous materials, operations, and equipment. This standard does not propose to address all the safety problems associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and  health  practices  and  determine  the applicability of regulatory limitations prior to use.
7 Notes
7.1 Glossary. Not applicable.
7.2 Acronyms, Abbreviations, and Symbols. Not applicable.
8 Coding System
This standard shall be referenced in other documents, drawings, etc., as follows:
Test to GMW15919
9 Release and Revisions
9.1 Release. This standard originated in May 2008, replacing GM9525P. It was first approved by Materials Engineering in July 2009. It was first published in July 2009.


關(guān)注本網(wǎng)官方微信 隨時(shí)閱讀專業(yè)資訊

 
 
打賞
[ 新聞資訊搜索 ]  [ 加入收藏 ]  [ 告訴好友 ]  [ 打印本文 ]  [ 違規(guī)舉報(bào) ]  [ 關(guān)閉窗口 ]
免責(zé)聲明:
本網(wǎng)站部分內(nèi)容來(lái)源于合作媒體、企業(yè)機(jī)構(gòu)、網(wǎng)友提供和互聯(lián)網(wǎng)的公開(kāi)資料等,僅供參考。本網(wǎng)站對(duì)站內(nèi)所有資訊的內(nèi)容、觀點(diǎn)保持中立,不對(duì)內(nèi)容的準(zhǔn)確性、可靠性或完整性提供任何明示或暗示的保證。如果有侵權(quán)等問(wèn)題,請(qǐng)及時(shí)聯(lián)系我們,我們將在收到通知后第一時(shí)間妥善處理該部分內(nèi)容。
 

GMW15919油漆附著力熱沖擊試驗(yàn)標(biāo)準(zhǔn)_91化工儀器網(wǎng)二維碼

掃掃二維碼用手機(jī)關(guān)注本條新聞報(bào)道也可關(guān)注本站官方微信賬號(hào):"xxxxx",每日獲得互聯(lián)網(wǎng)最前沿資訊,熱點(diǎn)產(chǎn)品深度分析!
 

 
0相關(guān)評(píng)論

 
欧美黑人性暴力猛交喷水黑人巨大 | 朝鲜女人大白屁股ass| 老太婆性杂交欧美肥老太| 亚洲av日韩av在线观看| 九月婷婷人人澡人人添人人爽| 婷婷色香五月综合激激情| 无码人妻丰满熟妇精品区| 亚洲国产日韩精品一区二区三区| 未满十八18禁止免费无码网站| 狂野欧美性猛交xxxx| 日产中文字幕在线观看| 国产精品久久久久影院嫩草| 日本丰满少妇裸体自慰| 少妇粉嫩小泬喷水视频| 亚洲无av在线中文字幕| 业余 自由 性别 成熟偷窥| 欧美丰满熟妇bbbbbb| 免费三级网站| 国产成人综合在线视频| 97人伦色伦成人免费视频| 国产亚洲精久久久久久无码77777 国产中年熟女高潮大集合 | 图片小说视频一区二区| 人妻无码久久一区二区三区免费 | 久久精品国产欧美日韩| 国产精品亚洲w码日韩中文| 久久精品国产自清天天线| 色妞色视频一区二区三区四区| 337p日本欧洲亚洲大胆色噜噜| 无码av波多野结衣久久| 中文字幕美人妻亅u乚一596| 农村老熟妇乱子伦视频| 99久久国语露脸精品国产| 国产人妻久久精品二区三区老狼| 亚洲自偷自拍另类第1页| 国产无遮挡又黄又爽免费网站| 巨胸不知火舞露双奶头无遮挡 | 国产真实伦在线观看| 永久免费人禽av在线观看| 国产精品偷窥熟女精品视频| 国产精品爆乳在线播放第一人称| 精品无码无人网站免费视频|